(1)
Nurlaila; Asfarina, S.; Setiawan, W. Cost and Time Efficiency of Reinforced-Concrete Column Construction Using Conventional and Ready-Mix Methods: A Case Study of the Nurul Yaqin Mosque Project in Bumi Pajo Village. Local Engineering 2026, 4, 83-88.