Nurlaila, Asfarina, S., & Setiawan, W. (2026). Cost and Time Efficiency of Reinforced-Concrete Column Construction Using Conventional and Ready-Mix Methods: A Case Study of the Nurul Yaqin Mosque Project in Bumi Pajo Village. Local Engineering, 4(2), 83–88. https://doi.org/10.59810/lejlace.v4i2.262