Nurlaila, Asfarina, S. and Setiawan, W. (2026) “Cost and Time Efficiency of Reinforced-Concrete Column Construction Using Conventional and Ready-Mix Methods: A Case Study of the Nurul Yaqin Mosque Project in Bumi Pajo Village”, Local Engineering, 4(2), pp. 83–88. doi: 10.59810/lejlace.v4i2.262.