Impact of Risk Associated with Procurement Process on Cost Performance of Public Tertiary Education Institution Projects in Ondo State, Nigeria

https://doi.org/10.59810/lejlace.v3i2.213

Authors

  • Fagbemi Kayode B. Department of Architectural Technology, Federal Polytechnic Ile-Oluji,Department of Architectural Technology, Federal Polytechnic Ile-Oluji

Keywords:

Cost performance, Ondo state, Procurement process, Public tertiary institutions, Risk assessment

Abstract

The procurement process remains a critical component in determining the success of construction projects, especially in public institutions. This study evaluates the impact of risks associated with procurement processes on the cost performance of building projects in public tertiary education institutions in Ondo State, Nigeria. Data were gathered from 63 construction projects using structured questionnaires and a pro forma. Analytical tools employed include frequency, mean item score, Paired-Samples T-Test, Shapiro-Wilk Test, Kruskal-Wallis Test, Mann-Whitney U Test, and Cronbach's Alpha. Results revealed a statistically significant difference between initial and final project costs, with major procurement risks identified at the planning, specification, and bid evaluation stages. The study recommends stricter attention to procurement planning and risk assessment to improve cost performance in public building projects.

References

Azhar, Nida, Rizwan U. Farooqui, and Syed M. Ahmed. 2008. “Cost Overrun Factors in Construction Industry of Pakistan.” In First International Conference on Construction in Developing Countries (ICCIDC–I), 499–508. Karachi, Pakistan.

Batenburg, R., & Versendaal, J. (2006). Business/IT alignment and purchasing effectiveness in a mature e-procurement environment. International Journal of Value Chain Management, 1(1), 32–50.

Chapman, Chris, and Stephen Ward. 1997. Project Risk Management: Processes, Techniques and Insights. 2nd ed. Wiley.

Chartered Institute of Procurement and Supply (CIPS). (2005). Procurement policy and performance management. CIPS Australia.

Ewa, U. (2013). Impact of intervention funds on tertiary education development in Nigeria. National Universities Commission (NUC) Report.

Gido, J., & Clements, J. P. (2003). Successful project management (2nd ed.). Thomson Learning.

Han, S. H., Kim, D. Y., Kim, H., & Jang, W. S. (2009). A web-based integrated system for international project risk management. Automation in Construction, 17(3), 342–356.

Kakwezi, Patrick, and Sonny Nyeko. 2010. “Procurement Processes and Performance: Efficiency and Effectiveness of the Procurement Function,” January.

Kothari, C. R. (2004). Research methodology: Methods and techniques (2nd ed.). New Age International.

Lædre, Ola, Kjell Austeng, Tore I. Haugen, and Ole Jonny Klakegg. 2006. “Procurement Routes in Public Building and Construction Projects.” Journal of Construction Engineering and Management 132 (7): 689–96. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(689).

Le-Hoai, Long, Young Dai Lee, and Jun Yong Lee. 2008. “Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries.” KSCE Journal of Civil Engineering 12 (6): 367–77. https://doi.org/10.1007/s12205-008-0367-7.

Lloyd, R. (2004). Procurement principles and management. Supply Chain Management Journal, 2(4), 66–74.

Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260.

Masterman, J. W. E. 1996. An Introduction to Building Procurement Systems. 2nd ed. Spon Press.

Memon, A. H., Rahman, I. A., & Azis, A. A. A. (2010). Factors affecting construction cost in Mara large construction project: Perspective of project management consultant. International Journal of Sustainable Construction Engineering and Technology, 1(2), 41–54.

Murdoch, John, Will Hughes, and Ronan Champion. 2008. Construction Contracts Law and Management. 4th ed. Taylor & Francis.

Naoum, S. G. (1991). An investigation into the performance of management contracts and traditional methods of procurement. Construction Management and Economics, 9(2), 171–190.

Nawaz, M., Shareef, M. I., & Ikram, M. (2013). Cost overrun factors in construction industry in Pakistan. Developing Country Studies, 3(3), 90–95.

Ng, S. T., & Skitmore, R. M. (1999). Contractor selection criteria: A cost-benefit analysis. IEEE Transactions on Engineering Management, 46(1), 96–103.

Odeyinka, H. A., & Iyaba, B. (2000). An evaluation of risk factors impacting construction projects in Nigeria. The Quantity Surveyor, 38(2), 1–4.

Ogunsanmi, O. 2013. “Effects of Procurement Related Factors on Construction Project Performance in Nigeria.” Ethiopian Journal of Environmental Studies and Management 6 (2): 215–22. https://doi.org/10.4314/ejesm.v6i2.12.

Pallant, J. 2005. “SPSS Survival Manual: A Step-by-Step Guide to Data Analysis Using SPSS for Windows.”

Project Management Institute (PMI). (2015). A guide to the project management body of knowledge (PMBOK Guide) (5th ed.). PMI.

Rashid, Rosli Abdul, Ismail Mat Taib, and Zainab Mohd Zainordin. 2006. “Effect of Procurement Systems on the Performance of Construction Projects.” Journal of Building Performance 2 (1): 94–103.

Skitmore, R. M., and D. E. Marsden. 1988. “Which Procurement System? Towards a Universal Procurement Selection Technique.” Construction Management and Economics 6 (1): 71–89. https://doi.org/10.1080/01446198800000008.

Smith, Nigel J. 1996. Managing Risk: In Construction Projects. Blackwell Science.

Tabachnick, B.G., and L.S. Fidell. 2001. Using Multivariate Statistics. 4th ed. Boston: Allyn and Bacon.

Wardani, E., Messer, D. R., & Horman, M. J. (2006). Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), 230–238.

Published

2025-11-01 — Updated on 2025-12-01

Versions

How to Cite

B., F. K. (2025). Impact of Risk Associated with Procurement Process on Cost Performance of Public Tertiary Education Institution Projects in Ondo State, Nigeria. Local Engineering, 3(2), 63–68. https://doi.org/10.59810/lejlace.v3i2.213 (Original work published November 1, 2025)

Issue

Section

Articles-Architecture

Similar Articles

<< < 1 2 

You may also start an advanced similarity search for this article.